Friday, April 9, 2010
Weekly Log April 9
This week, I have met with Amy to discuss what steps are next. We need to cap the pipe inside the bucket to stop water from entering the bucket. After that, we will need to put caulk around the holes in the bucket to stop leaks. After that, we will tape all the small buckets to the frame of the large bucket, so that they will stay in place when we use the foam to make the hull.
Subscribe to:
Post Comments (Atom)
Blog and schedule look good-thanks!!cmcd
ReplyDelete